Robinson Bayou Bank Stabilization
Screen Shot 2013-08-29 at 4.33.37 PM.pngDescription
The project consists of stabilizing the banks of Robinson Bayou from Abilene Street to FM 270, a project length of approximately 2,300 linear feet, though the installation of concrete slope paving, gabions, and soil bioengineering methods.

Location
Proposed project area is Robinson Bayou from Abilene St. to FM 270, a project length of approximately 2,300 linear feet.

Why It's Needed
Portions of the existing banks are being lost due to the effects of scouring. A main concern is that root systems of adjacent a large tree or trees could be undermined, causing a tree or trees to fall into the bayou, damming the bayou at the FM 518 or FM 270 bridges, with upstream flood damage.

Need More:
Looking for financial information or more? You can view the most recent quarterly and monthly status reports with more detail by clicking on the following: Status Reports Quarterly reports will give you where we are at in the budget for the project and monthly reports will give you the latest status updates on active project.